#WalangKuryente: Power interruption sa Luzon sa Hunyo 17-23

ABS-CBN News

Posted at Jun 16 2019 12:31 PM

Inanunsiyo ng Manila Electric Company (Meralco) na mawawalan ng kuryente sa ilang lugar sa Metro Manila, Batangas, Cavite at Laguna ngayong linggo.

Bunsod ito ng mga maintenance o pagkukumpuni na isasagawa sa mga nasabing lugar.

 

MAKATI CITY
HUNYO 18 – 19, 2019, MARTES HANGGANG MIYERKOLES
Sa pagitan ng alas-11:30 ng gabi (Martes) at alas-12:30 ng hatinggabi (Miyerkoles)

- 28th at 29th Sts. sa Bgy. East Rembo.

DAHILAN: Line reconstruction works sa 28th St., Bgy. East Rembo, Makati City.

HUNYO 19, 2019, MIYERKOLES
Sa pagitan ng ala-1 ng madaling araw at alas-2 ng madaling araw

- Sampaguita Ext. St. mula Begonia St. hanggang Gladiola St. kasama ang Doña Aurora, Cattleya, Ivory at Spring Beauty Sts. sa Bgy. Rizal.

DAHILAN: Line reconstruction works sa Sampaguita Ext. St., Bgy. Rizal, Makati City.

HUNYO 23, 2019, LINGGO
Sa pagitan ng alas-9 ng umaga at alas-4 ng hapon

- Bahagi ng Nicanor Reyes St. (Reposo) mula Kalayaan Ave. hanggang J. P. Rizal St. kasama ang Milagros, Asuncion at D. Oliman Sts. sa Bgy. Valenzuela.
- Bahagi ng J. P. Rizal St. mula E. Zobel St. hanggang Pateros St. kasama ang Makati City Hall Compound, Chowking, McDonald’s Restaurant, Jollibee, Banco De Oro, Philippine National Bank, Mercury Drug at LBC Bank sa Bgy. Poblacion.
- Bahagi ng S. Osmeña St. mula E. Zobel St. hanggang at kasama ang Fortuna, Sultana, Colmeña, Hormiga, Yungue, Obrero, Trabajo, Constancia, Honradez, J. B. Roxas, Pateros, Taguig, Pilillia, Tanay, Teresa, Antipolo, Cardona, Angono. Baras and Morong Sts.; Gen. Pio Del Pilar National High School, Jose Magsaysay Elementary School, The Silver Place Hotel, Ministop, NIMPO Bldg., Pasig River Rehabilitation Commission (PRRC) Guadalupe Ferry Station, Riverside Studios Manila, Makati Foundry Inc., Manila Water Sewerage Treatment Plant at La Campana Fabrica De Tabacos Inc. sa Bgys. Olympia, Valenzuela at Poblacion.

DAHILAN: Line reconductoring works sa Nicanor Reyes at J. P. Rizal Sts. sa Bgys. Poblacion at Valenzuela, Makati City.

MANILA (STA. CRUZ)
HUNYO 23, 2019, LINGGO
Sa pagitan ng alas-8 ng umaga at alas-2 ng hapon

- Bahagi ng Lico St. mula Rizal Ave. hanggang Mariano Ponce St.

DAHILAN: Pagpalit sa poste sa Lico St. sa Sta. Cruz, Manila.

MARIKINA CITY (INDUSTRIAL VALLEY)
HUNYO 19, 2019, MIYERKOLES
Sa pagitan ng alas-10 ng umaga at alas-3 ng hapon

- Sitio Olandes.

DAHILAN: Line reconductoring works sa Sitio Olandes, Bgy. Industrial Valley, Marikina City.

PARAÑAQUE CITY (STO. NIÑO) AT PASAY CITY
HUNYO 16 – 17, 2019, LINGGO HANGGANG LUNES
Sa pagitan ng alas-11:30 ng gabi at alas-11:59 ng gabi (Linggo)

- Bahagi ng Ninoy Aquino Ave. mula E. Rodriguez Jr. St. hanggang at kasama ang Marigold St. sa Rivera Village sa Pasay City; Pacific Grand Villa Subd.; Veronica De Leon Ave. at Del Bros Ave.; Pascor Drive; Sta. Agueda, Johannes at Dr. Jose Rizal Sts.; Sky Freight Forwarders Inc., Airspeed International Corp., CKK Prime Holdings Inc., CPI Transport Inc., Federated Distributors Inc., GLY Development Corporation, Interadent Zahntechnik Philippines, Solar Resources Inc., Air Power International Express Philippines, Airport Builders & Management Corp., All Transport Network Inc., CEVA Logistics Philippines Inc., Delbros Inc., DHL International Corp., DZ Card Philippines Inc., Expeditors Philippines Inc., Foreign Mission Board SBC Luzon, Harbor View Corp., La Copa Restaurant, Megamile Realty Development Inc., MTE Properties Inc., Nippon Express Philippines Inc., Pan Globe Cargo Express Inc., Peoples Air Cargo & Warehousing, SPI Technologies Inc., Trans-Global Consolidators Inc., B & L Worldwide Marketing Corp. at Lucky Asia International Trading Corporation sa Bgy. Sto. Niño, Parañaque City.

Sa pagitan ng alas-11:30 ng gabi (Linggo) at alas-4:30 ng madaling araw (Lunes)

- Bahagi ng Ninoy Aquino Ave. mula malapit sa Multinational Ave. hanggang E. Rodriguez Jr. St. kasama ang Luk Foo Restaurant, Puregold – Parañaque, Royal Cargo Inc. at Duty Free Philippines.

DAHILAN: Line reconductoring works sa Ninoy Aquino Ave. sa Bgy. Sto. Niño, Parañaque City.

TAGUIG CITY
HUNYO 19, 2019, MIYERKOLES
Sa pagitan ng alas-3 ng madaling araw at alas-4 ng madaling araw

- Bahagi ng Dahlia St. mula Maestrang Pinang St. hanggang at kasama ang Samama Compound; Dreamville, Rosal at Sampaguita Sts. sa Bgy. Ligid – Tipas.

DAHILAN: Line reconstruction works sa Samama Compound, Bgy. Ligid – Tipas, Taguig City.

VALENZUELA CITY (CANUMAY WEST)
HUNYO 17 - 18, 2019, LUNES HANGGANG MARTES
Sa pagitan ng alas-10 ng gabi (Lunes) at alas-6 ng umaga (Martes)

- Bahagi ng T. Santiago St. mula Maysan Road hanggang at kasama ang Plastic City; Datrima Packaging, Toronto Plastic Mfg., Amberville Industrial, South Pacific Plastic Mfg., Precision Master Technology, DTM Print and Label Specialist.

DAHILAN: Pagpalit ng mga poste at line reconductoring works sa T. Santiago St. sa Bgy. Canumay West, Valenzuela City.

BATANGAS (STO. TOMAS)
HUNYO 21, 2019, BIYERNES
Sa pagitan ng alas-9 ng umaga at alas-2 ng hapon

- Bahagi ng San Bartolome Barangay Road mula Sto. Tomas – Tanauan Highway hanggang at kasama ang Christ’s Commission Foundation Ministries Inc. at Kemeny Asia Corporation; Purok 4 at Purok 7; at Morgan Residences sa Bgy. San Bartolome.

DAHILAN: Line reconductoring works at pagpalit ng mga poste sa Bgy. San Bartolome, Sto. Tomas, Batangas Province.

CAVITE (SILANG)
HUNYO 17, 2019, LUNES
Sa pagitan ng alas-10 ng umaga at alas-3 ng hapon

- Camella Alta Silang Subd. sa Bgy. Biga I.

DAHILAN: Paglipat ng mga pasilidad sa Emilio Aguinaldo Highway, Bgy. Biga I, Silang, Cavite.

LAGUNA (SAN PEDRO)
HUNYO 22, 2019, SABADO
Sa pagitan ng alas-10 ng umaga at alas-2 ng hapon

- Mercedes Homes Subd. Phase 1 at Adelina Complex Subd. Phase 2 sa Bgy. San Vicente.

DAHILAN: Pagpalit sa mga poste at reconductoring ng mga pangunahing linya sa Mercedes Homes Subd. Phase 1, Bgy. San Vicente, San Pedro, Laguna.

Bisitahin ang Patrol.PH para sa iba pang mga balita.