Heavy traffic build-up on NLEX, SLEX

Posted at Apr 05 2012 11:22 AM | Updated as of Apr 05 2012 07:22 PM

Toll Regulatory Board executive director Edmund Reyes says the biggest problem right now is the heavy volume at the Calamba exit at the South Luzon Expressway (SLEX) and Dau exit at the North Luzon Expressway (NLEX).

Meanwhile, ABS-CBN reporter Jeff Canoy notes there is heavy buildup of vehicles from the Balintawak cloverleaf to the Balintawak toll plaza, right before entering the highway. An NLEX official says motorists should expect to wait 30 minutes to 1 hour at the toll plaza. Some 180,000 to 200,000 vehicles are expected to traverse the NLEX today. ANC, April 5, 2012